|
MECHANICAL & ENGINEERING |
-
Emergency power: 100% back up power
-
Air conditioning: VRV III Daikin system, air conditioning completed with temperature control thermostats in the office area.
-
Lifts: 2 Passenger Otis lifts, Capacity 1,000kg, high-speed (1.75m/sec).
-
Security: digital CCTV cameras (24 hours per day)
-
Fire security: Safety standard (sprinkler systems, smoke detectors and hose reels)
-
Lighting level: Avg 400 lux fluorescent daylight
-
Telecom, IT support: IDD telephone concentrator, trunks for ADSL, Internet, PE cable and cable TV
|
|
|
| INTERIOR DESIGN: |
-
G/F Lobby: Granite flooring, marble walls
-
Emergency door: Fire proofing with fire resistance to a maximum of 90 minutes
-
Emergency exits: Pressurized
-
Windows-Curtain wall: using two layers laminated glass for reducing direct sunlight and air conditioning costs
-
Wall finish: High quality ICI paint
-
Ceiling: using American-made acoustic ceiling for noise reduction (the sound absorption and sound attenuation of the mineral fiber ceiling board makes the people work more effectively and comportably.)
-
Sanitary: INAK sanitary products with sensors for bidet.
Using safety laminated glass for reducing cooling loads, saving the electric energy, the fenestration curtain glass wall provides abundant natural light to all space of the floor plate.
-
Structure: anti-earthquake designed
|
|
|